Supply & install Daikin VRV system for the Social club building located in Dorret Karraz compound, New Cairo.
BIM Implementation Management / BIM Modeling & Coordination / BIM Model Audit & Validation
– Coordinating between multi disciplines ex. Architecture, Structure, Electrical, mechanical, fire control and Plumbing
– Stablishing Clashes Detection Reports
– Implementing and maintaining BIM Protocol
– Preparing BIM Execution Plan
– Managing BIM Workflow
– 3 D BIM Modeling Architecture, Structure and MEP
– Auditing and Reviewing BIM Model
– Stablishing BIM Quality assurance
– Running Coordination Meetings between project parties
Project Description :
-The Hall is a sports building of 5 non identical floors for 8000 audiences around the main court, secondary basketball court , administrative rooms and services .
-The total built-up area is 57,760 m2.
Project Owner :
Engineering Authority of Egyptian Armed Forces
BIM Implementation Management / BIM Modeling & Coordination / BIM Model Audit & Validation
– Coordinating between multi disciplines ex. Architecture, Structure, Electrical, mechanical, fire control and Plumbing
– Stablishing Clashes Detection Reports
– Implementing and maintaining BIM Protocol
– Preparing BIM Execution Plan
– Managing BIM Workflow
– 3 D BIM Modeling Architecture, Structure and MEP
– Auditing and Reviewing BIM Model
– Stablishing BIM Quality assurance
– Running Coordination Meetings between project parties
Project Description :
The main tennis court is composed of 4 floor plans for 3500 audiences besides the services and administration area
The total built up area is 19 525 m 2.
Project Owner :
Engineering Authority of Egyptian Armed Forces
Scope of work:
Supply of ventilation system by Nuaire Ventilation Fans and supply and installation of Daikin VRV system for
seven buildings of total built up area 74,909 m2.
Project Owner:
Ministry of Defense
Construction of the new Headquarters of the Administrative Control Authority in the New Administrative Capital, which includes seven buildings on a total built up area of 74,909 m2.
The HQ is classified as follows: Main building, Admin building, Control building I, Control building II, Conference Hall, Mosque, and a Villa.
Morph is dedicated for the supply of the ventilation system of the building by Nuaire Ventilation Fans and supply and installation of Daikin VRV system.
Project Owner:
Engineering Authority of the Egyptian Armed Forces
This project located in the New Administrative Capital includes an indoor hall with a seating capacity of 7,000 persons, which will host the 2021 World Men’s Handball Championship, as well as an Olympic swimming pool complex, squash and tennis courts.
Nuaire’s Supply Exhaust and Smoke Fans are recommended as the primary ventilation system for the Covered Hall for their reliability and low energy consumption.
They are tested in accordance with the latest legislation and testing procedures, to ensure ventilation that matches the project area.
Supply & install Daikin VRV system + Air side ventilation system for the ACA building (Administrative Control Authority), located in the New Administrative Capital.
Supply & install Daikin VRV system 520 USRT + Air side ventilation system for residential presidential palaces( 6 Villas ) located in Dorret Karraz compound, New Cairo.
Supply and install Daikin VRV system 360 USRT for administrative building representing the head office of Pharco pharmaceutical- one of the leading manufacturing companies in the pharmaceutical industry, Located in New Cairo
Supply of Nuaire ventilation fans for the Swimming Pool project, located in the new Sports Complex, New Administrative Capital – Egypt.
Project Owner:
Ministry of Youth and Sports